Location: Houston
Kleb Woods Stormwater Detention Basin Phase 2 ($6,555,813.15)
This project was constructed for Harris County Precinct 2 and consisted of the development of Phase 2 of the Kleb Woods stormwater Detention Basin at the northwest corner of the Mueschke Road and future Holderrieth Road intersection. The construction included the provision of traffic control devices, 676,375 cubic yards of detention pond excavation with off-site disposal at a client-approved location, final grading, stormwater pollution prevention, and sodding for erosion control. Serco successfully moved the entire soil volume of the site without incident, on schedule, and within budget.